3 MLD waste water is pumping out for treatment from 800 MLD
Direct pumping over top of BR without any primary treatment
Facility is constructed in half masonry and half media bund
Power 0.05 kWH/kL
Results:- Plant performance of plant for 6 months
Project proposed by Dept of Rural Development Gujarat as a special demonstration case for CAMUS SBT.
0.6 MLD sewage is generated from village.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Power requirement is less than 0.1 kWh/ kL
Using Water for farming
Results:- In recent study of water tests shows that BOD is less than 4.5 and COD is less than 40 with removal efficiency of BOD and COD are greater than 98% and greater than 92% respectively and treated water discharging into the lake.
Features of Jaisalmer Soil Biotechnology Plant:-
Project in desert area with variant atmosphere.
Preliminary, Primary, secondary treatment administrative and control room all facilities are RCC structures
Plant is designed to give treated water for irrigation standards.
Power requirement is 0.1 kWh/KLD
Using water Gardening.
Results:- Water tests shows that BOD is less than 10 and COD is less than 80 with removal efficiency of BOD and COD are greater than 91% and greater than 80% respectively and treated water is using for watering for garden and lawn.
Features of HDIL Virar Soil Biotechnology Plant:-
Project proposed in the median of wide 6m on road between two residential buildings.
Preliminary, Primary, secondary treatment and tertiary treatment, administrative and control room all facilities are RCC structures
CAMUS SBT itself acts as a secondary and tertiary treatment
Treated water for reuse.
Power requirement is 0.1-0.15 kWh/KLD
Using the water for flushing, car washing, construction and Gardening
Results:- In recent study of water tests shows that BOD and COD are less than 5 with removal efficiency of BOD and COD are greater than 99% and treated water quality nearly equal to drinking water. Treated water is used for construction, flushing, plantation, car washing and floor cleaning.
Features of GSEB Panandhro Soil Biotechnology plant :-
Project in desert area with variant atmosphere.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Plant is designed to reuse the treated water for gardening and irrigation.
Power requirement is less than 0.1 kWh/kL
Using the water for gardening
Results:- Water tests shows that BOD is less than 8.5 and COD is less than 59 with removal efficiency of BOD and COD are greater than 96% and greater than 81% respectively and treated water is using for watering for garden and lawn.
Features of GSEB Sikka Soil Biotechnology plant:-
Project in desert area with variant atmosphere.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Plant is designed to reuse the treated water for gardening and irrigation.
Power requirement is less than 0.1 kWh/kL
Using the water for gardening
Results:- Water tests shows that BOD is less than 8.5 and COD is less than 59 with removal efficiency of BOD and COD are greater than 96% and greater than 81% respectively and treated water is using for watering for garden and lawn.
Features of CHAF Bangalore Soil Biotechnology plant:-
Project in Hospital, all the waste water will come including blood, tissues.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Power requirement is 0.2 kWh/kL
Using water for farming.
Results:- Water tests shows that BOD is less than 5 and COD is less than 26 with removal efficiency of BOD and COD are greater than 98% and greater than 99% respectively and treated water is using for watering for irrigation of CHAF farming fields to recover the investments.
Features:-
Project in Airport area with variant atmosphere.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Power requirement is 0.2 kWh/kL
Using water for gardening
Results:- Water tests analysis for 8 months in 2014 which shows the treated water quality is also consistent with variable load. Treated water is used for gardening.
Features of DLF Garden Estate Soil Biotechnology plant:-
Project in VIP area with peaceful atmosphere.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Power requirement is 0.2 kWh/kL
Using the water gardening, Car washing and road cleaning.
Results:- Water tests shows that BOD is less than 14 and COD is less than 37 with removal efficiency of BOD and COD are greater than 98% and greater than 99% respectively and treated water is using for watering for gardening.
Features of BBMP Bangalore Soil Biotechnology Plant:-
Project proposed by Task Force for Quality Assurance in public construction, secretariat office, Government of Karnataka as a special demonstration case for CAMUS SBT.
For restoration of Lake
1.4 MLD sewage is separated from 8 MLD inflow which contains the effluents from textile industry.
Preliminary, Primary, secondary treatment, administrative and control room all facilities are RCC structures
Power requirement is less than 0.1 kWh/ kL
Results:- In recent study of water tests shows that BOD is less than 4.5 and COD is less than 40 with removal efficiency of BOD and COD are greater than 98% and greater than 92% respectively and treated water discharging into the lake.